eLab Logo

Viewing an Existing Task

After a task is saved you can later return to it to complete any missing details or for review. To view an existing task:

  1. If you want to open a task that has already been set to completed or failed, modify the settings under the Filter drop down control in the Task View.
  2. Select the protocol of the task from the protocol control in the Task group.
  3. Select the version of the protocol, if known.
  4. Choose the required Task number from the Task control.